Transforming Collins Street

Transforming Collins Street Graphic

The Transforming Collins Street project is a tactical trial designed to reimagine and develop a long-term vision for Collins Street. The project was endorsed for installation by the Hobart City Council at its meeting in September 2024.

The project involves various temporary changes, including streetside dining areas and separated cycling lanes, along a 700-metre stretch of Collins Street (between Molle and Murray streets).

As part of its resolution, Council emphasised the importance of regular monitoring and evaluating the trial’s impact. The resolution specifically outlined a commitment to structured reporting at key intervals throughout the two-year trial.

For full details, refer to the Council Meeting agenda.

Reporting commitment

The council's resolution requires ongoing reporting on the project's progress, including community sentiment, usage data, and other key metrics.

The Monitoring and Evaluation Framework, which outlines the approach for tracking the trial's effectiveness, can be access here: Monitoring & Evaluation Framework

Monitoring reports

This page will house all monitoring reports from each phase of the trial. These reports will provide insights gathered from community feedback, street usage data, and other evaluation metrics.

  • Stage one: Pre-installation Engagement (Feb-Mar 2025) | Completed
  • Stage two: One-month Post-installation Engagement (Jun-Jul 2025)
  • Stage three: Three months Post-installation Engagement (Sep 2025)
  • Stage four: One year Post-installation Engagement (Jun 2026)
  • Stage five: Conclusion of Trial Engagement (Jun 2027)

The Transforming Collins Street project is a tactical trial designed to reimagine and develop a long-term vision for Collins Street. The project was endorsed for installation by the Hobart City Council at its meeting in September 2024.

The project involves various temporary changes, including streetside dining areas and separated cycling lanes, along a 700-metre stretch of Collins Street (between Molle and Murray streets).

As part of its resolution, Council emphasised the importance of regular monitoring and evaluating the trial’s impact. The resolution specifically outlined a commitment to structured reporting at key intervals throughout the two-year trial.

For full details, refer to the Council Meeting agenda.

Reporting commitment

The council's resolution requires ongoing reporting on the project's progress, including community sentiment, usage data, and other key metrics.

The Monitoring and Evaluation Framework, which outlines the approach for tracking the trial's effectiveness, can be access here: Monitoring & Evaluation Framework

Monitoring reports

This page will house all monitoring reports from each phase of the trial. These reports will provide insights gathered from community feedback, street usage data, and other evaluation metrics.

  • Stage one: Pre-installation Engagement (Feb-Mar 2025) | Completed
  • Stage two: One-month Post-installation Engagement (Jun-Jul 2025)
  • Stage three: Three months Post-installation Engagement (Sep 2025)
  • Stage four: One year Post-installation Engagement (Jun 2026)
  • Stage five: Conclusion of Trial Engagement (Jun 2027)
  • CLOSED: The pre-installation survey has concluded. The stage 2 survey will open on 30th June 2025.
    • This survey was completed by 134 people between 28 February and 16 March 2025.
    • The results of the survey are available in the Monitoring Report for stage one.
    • Reports and Documents can be found in the "Important Links" box on the right-hand side of this page.

    Thank you to those who took the time to provide feedback on the Transforming Collins Street tactical trial.

    Another survey will become available in stage two, which is expected to occur in June 2025.

Page last updated: 29 May 2025, 03:39 PM