Skip to content

Three-months post-installation Engagement Survey

Thank you for taking the time to provide feedback on the third round of engagement of the Transforming Collins Street Two-Year Tactical Trial.

This trial involved a variety of changes to Collins Street. Changes include:
  • new streetside dining areas
  • separated bike lanes
  • a zebra crossing
  • new accessible parking spaces 
  • removal of some on-street parking spaces
The trial has been installed on Collins Street between the Molle Street intersection through to Victoria Street. A further section of changes between Victoria Street and Murray Street will occur earlier in the new year.


The City of Hobart will be asking the community for feedback throughout the trial. This will happen five times during 2025 and 2026 in accordance with the Council’s resolution. 

At the end of each stage, feedback will be gathered and summarised in a short report. This report will be shared with City of Hobart elected members and made publicly available on the City of Hobart project web page. Check the survey reports from previous engagement HERE.

This survey will take approximately five minutes to complete.  

This survey will close on 23rd November 2025. 


PRIVACY STATEMENT  

“Your survey results would be shared and included in the feedback report for this project. No personal details will be shared with anyone.”

 

 

If you are already signed in, please refresh this page